Althorpe Station Temporary Footbridge

Layher Footbridge at Althorpe Station.

The temporary footbridge will replace the existing footbridge for pedestrian access across the track. 

The bridge was lifted into position in under 2 hours and secured to the pre-built staircases. 

The whole assembly is fully compliant with public access and Network Rail regulations.