Layher Footbridge at Althorpe Station.
The temporary footbridge will replace the existing footbridge for pedestrian access across the track.
The bridge was lifted into position in under 2 hours and secured to the pre-built staircases.
The whole assembly is fully compliant with public access and Network Rail regulations.