From first interview Crossway Scaffolding demonstrated they understood what protection was needed to achieve, both from public protection point of view and as a working platform, working closely together with ourselves over a number of weeks the scheme was developed further and final designs produced with some truly innovative solutions.
From the outset Crossway have delivered in every way, the protection deck has been constructed over multiple rail and Metrolink platforms utilising limited time working possessions, while maintaining the ped flow requirements for station that is open 24 hours a day with 6 million passengers a year and an arena with 22,000 capacity exiting over a 20 minute period up to twice a day.